The North Logan Master Fee Schedule of North Logan, Utah, was initially published in house without codification software. The Master Fee Schedule was maintained and updated through 2014. In 2015, codification and administration of the Master Fee Schedule began in-house under the direction of the City Recorder, Scott Bennett, and with the assistance of Municipal Code Online, Inc.
This Master Fee Schedule shall be cited as the North Logan Master Fee Schedule or “NLMFS” as an acronym. Include numbering system they select (see HTML code to delete comments if they adopt MCO numbering).
NLMFS is current and up to date as of 02/19/2025.
The Master Fess Schedule is supplemented from time to time with amendments and additions made by North Logan City. The specific legal sources that comprise this Master Fee Schedule have been adapted during the codification process from the original formatting of the official hard copy. In the event of discrepancies between the online Master Fee Schedule and the official hard copy, the official hard copy governs. Municipal Code Online, Inc., provides a searchable database of the Master Fee Schedule for easy reference and convenience.
NOTICE: THE MASTER FEE SCHEDULE MAY NOT REFLECT ALL OR THE MOST CURRENT VERSION OF LEGISLATION ADOPTED BY THE CITY COUNCIL THAT HAS YET TO BE UPDATED ONLINE. IN THE EVENT OF CONFLICT BETWEEN THE MASTER FEE SCHEDULE AND A WRITTEN RESOLUTION, THE RESOLUTION TYPICALLY GOVERNS. ALSO, THE MASTER FEE SCHEDULE MAY NOT REFLECT RULES OR OTHER REGULATIONS PROMULGATED UNDER THE AUTHORITY OF THE MUNICIPAL CODE, INCLUDING TECHNICAL SPECIFICATIONS. FOR MORE INFORMATION CONTACT SCOTT BENNETT, CITY RECORDER, AT 435-752-1310 OR recorder@northlogancity.gov
Commercial Business License Class 1: < or = 90,000 sq.ft. Class 2: > 90,000 sq.ft. and/or Large manufacturer | $95.00 base* (includes up to One-Hour Fire Inspection) $175.00 base* (includes up to Three-Hour Fire Inspection) * If the business has Hazardous Materials on premises, add applicable fee |
Home Occupation License Exempt: No license issued
|
$45.00 base* * If the business has Hazardous Materials on premises, add applicable fee |
Hazardous Materials Fee Added Fee for Fire Inspection* Enhanced Police Service Late Charges License Replacement | Add $16.00 Add $16.00 per half hour Add $16.00 per hour. (Based on typical number of hours police expect to service the business in a year beyond what a normal business would take. – Chief of Police determines.) $20.00 per month license is delinquent $10.00 per replacement |
Disproportionate Business License Fee | $290.00 per response, after the base level of service (Each response by the Fire/EMS department to a business beyond a base level of service will be billed quarterly). Businesses shall be allocated a base level of service as follows:
|
Licenses for the Sale of Alcoholic Beverages (Annual) Consumption Off Premises Beer On Premise Beer Retailer License Limited Restaurant License On Premise Banquet License Tavern License Restaurant Liquor License Temporary Beer Permit Private Club Liquor License Surety Bond (All Alcoholic Licenses) | $100.00 $100.00 $100.00 Not Available Not Available $100.00 $35.00 per thirty-day period or fraction thereof Not Available $1,000.00 Bond |
Miscellaneous – Other Door-to Door Vendors Off-Site Car Sales Entertainment Events Christmas Tree Lots Misc. Other where it is determined that an inspection of the event/sale is needed. (City Administrator Determines) | $96.00 $45.00 $45.00 $45.00 $45.00 |
License for Selling Fireworks The license is in addition to a business’s regular license if the fireworks are sold within the business. It is meant to cover the costs of additional fire dept. inspections to ensure safety regulations are followed specifically for the sale of fireworks. It is non refundable. One annual license covers the year’s fireworks season even if multiple inspections are to be made. Bond for Selling Fireworks The bond is in addition to a business’s regular license fees and is refundable each year after the Chinese New Year. If there are violations of local or state law and regulations for selling fireworks, at the City Recorder’s discretion, all or part of the bond may be forfeited to the City. |
|
* The Fire Chief shall, each year, provide to the City Recorder a list of types of businesses and the associated type of fire inspections that will be required and the applicable duration of the fire inspection. The Chief of Police will do the same for enhanced police services. This list will be used to compute the license fees per the above schedule.
Solid Waste Collection Note: Other charges not listed such as special pickup, extra pickup, bulk waste charge, etc. are as per the Fee from the contracted Solid Waste Management Company.
| 1st Residential 90-gal. Container $16.85 per month 1st Residential 60-gal. Container $15.80 per month 2nd Residential 60 or 90 gal Container $7.20 per month (plus a NLC $1.50 processing fee) Green Waste Can - $11.05 per month 1st Recycle Can - $5.30 per month 2nd Recycle Can - $3.15 per month Container Exchange - $47.30 per occurrence Container Delivery - $26.30 per occurrence Removal Charge - $26.30 per occurrence Contamination Charge - $5.30 per occurrence Overage Charge - $5.30 per occurrence Resume Charge - $26.30 per occurrence Container Replacement - 79.00 per occurrence $7.00 in addition to the collection fee above |
Overdue Account Administration Fee for Delinquent Solid Waste Collection Only Accounts | $25.00 For processing overdue billing for an account for Solid Waste Collection Only for a delinquent account for the first occurrence within 365 calendar days. $50.00 For processing overdue billing for an account for Solid Waste Collection Only for a delinquent account for the second occurrence within 365 calendar days. $100.00 For processing overdue billing for an account for Solid Waste Collection Only for a delinquent account for the third occurrence within 365 calendar days. |
Utility Account Deposit (To establish a payment security account for renters when they are initially responsible for the payment of the utility account) | $100.00 For Residential Renter Account $300.00 For Business Account |
Emergency Communications & Response Fee | $6.00 per month per residential unit, or per non-residential business entity. |
Water Disconnection/Reconnection Service Fee | $25.00 (an additional $10 for each service call for either disconnection or reconnection if the service call must be done during other than normal duty hours). |
Sewer Reconnection | No fee but must pay any costs incurred by the city |
Delinquent Account/Disconnect Notice (An Overdue Account Administration Fee may also be charged if applicable. See "Other, Misc. Fees" | $5.00 each required notification |
Note. Wherever the Master Fee Schedule states "pay any costs incurred by the city" the applicant must reimburse the city for all costs incurred by the city arising with respect to the application including any reasonable and necessary legal, engineering, or other professional fees; costs of advertising or giving of legal notice; special material; or other direct costs.
Water Usage Fee for Single Family. | Base rate of $12.15
Tier 1) $1.57 per 1,000 gallons for usage between 0 and 10,000 gallons
Tier 2) $1.70 per 1,000 gallons for usage between 10,001 to 30,000 gallons
Tier 3) $1.83 per 1,000 gallons for usage between 30,001 to 60,000 gallons
Tier 4) $2.95 per 1,000 gallons for usage between 60,001 to 90,000 gallons
Tier 5) $5.25 per 1,000 gallons for usage between 90,001 to 125,000 gallons
Tier 6) $6.50 per 1,000 gallons for usage between 125,001 to 150,000 gallons
Tier 7) $7.75 per 1,000 gallons for usage between 150,001 to 250,000 gallons
Tier 8) $9.00 per 1,000 gallons for usage between 250,001 to 300,000 gallons
Tier 9) $10.25 per 1,000 gallons for usage exceeding 300,000 gallons |
Water Usage Fee for Single Family (with secondary water available for exterior use) Culinary Tiered water rates for subdivisions or developments that were modeled or approved with secondary water for exterior watering needs. Or, developments that have a secondary water stub to homes within the subdivision, or developments with the presence of ¾ inch meters or ¾ inch service lines. Or, if a homeowner would cause non-compliance related to culinary pressure or volume in a development or culinary system if they were to utilize culinary water for exterior watering in lieu of secondary water. | Base rate of $12.15 Tier 1) $1.57 per 1,000 gallons for usage between 0 and 10,000 gallons Tier 2) $3.35 per 1,000 gallons for usage between 10,001 to 20,000 gallons Tier 3) $8.83 per 1,000 gallons for usage exceeding 20,000 gallons |
Water Usage Fee for Apartment Complexes Multi-Unit buildings (Any complex on a single meter that contains one or more structures designed to accommodate multiple units above and beside each other. The rate will be applied to the entire complex) | Base Rate of $7.11 per unit. Tier 1) $2.25 per 1,000 gallons for usage between 0 and 250,000 gallons Tier 2) $2.85 per 1,000 gallons for usage between 250,001 to 500,000 gallons Tier 3) $3.40 per 1,000 gallons for usage between 500,001 to 750,000 gallons Tier 4) $5.45 per 1,000 gallons for usage between 750,001 to 1,000,000 gallons Tier 5) $7.75 per 1,000 gallons for usage exceeding 1,000,000 gallons |
Water Usage Fee for Multi Units
(Any residential buildings that have 2+ units per meter) (Single Family Development behind a single meter - i.e., Townhomes, PUD, etc. – that does not contain any structures that contain units above each other) | Base Rate of $7.11 per unit.
Tier 1) $2.25 per 1,000 gallons for usage between 0 and 500,000 gallons
Tier 2) $2.40 per 1,000 gallons for usage between 500,001 to 1,000,000 gallons
Tier 3) $2.45 per 1,000 gallons for usage between 1,000,001 to 1,500,000 gallons
Tier 4) $2.50 per 1,000 gallons for usage between 1,500,001 to 2,000,000 gallons
Tier 5) $2.60 per 1,000 gallons for usage between 2,000,001 to 2,500,000 gallons
Tier 6) $3.50 per 1,000 gallons for usage between 2,500,001 to 3,000,000 gallons
Tier 7) $5.25 per 1,000 gallons for usage between 3,000,001 to 3,500,000 gallons
Tier 8) $6.95 per 1,000 gallons for usage between 3,500,001 to 4,000,000 gallons
Tier 9) $10.25 per 1,000 gallons for usage exceeding 4,000,000 gallons |
Water Usage Fee for Institutional Unit | Meter size in inches Monthly flat user fee
¾ or 1 $12.15 Or the rate to be determined by the City Council for any other sized meters.
Tier 1) $1.57 per 1,000 gallons for usage between 0 and 10,000 gallons
Tier 2) $1.70 per 1,000 gallons for usage between 10,001 to 30,000 gallons
Tier 3) $1.83 per 1,000 gallons for usage between 30,001 to 60,000 gallons
Tier 4) $2.95 per 1,000 gallons for usage between 60,001 to 90,000 gallons
Tier 5) $5.25 per 1,000 gallons for usage between 90,001 to 125,000 gallons
Tier 6) $6.50 per 1,000 gallons for usage between 125,001 to 150,000 gallons
Tier 7) $7.75 per 1,000 gallons for usage between 150,001 to 250,000 gallons
Tier 8) $9.00 per 1,000 gallons for usage between 250,001 to 300,000 gallons
Tier 9) $10.25 per 1,000 gallons for usage exceeding 300,000 gallons |
Water Usage Fee for Commercial Unit | Meter size in inches Monthly flat user fee
¾ or 1 $12.15 Or the rate to be determined by the City Council for any other sized meters.
Tier 1) $1.95 per 1,000 gallons for usage between 0 and 250,000 gallons
Tier 2) $2.75 per 1,000 gallons for usage between 250,001 and 500,000 gallons
Tier 3) $4.75 per 1,000 gallons for usage between 500,001 and 1,000,000 gallons |
Water Conservation Water Usage Fee for New Development without access to secondary irrigation on the lot after 02/16/2022 | Base rate of $12.15
Tier 1) $5.00 per 1,000 gallons for usage between 0 and 15,000 gallons
Tier 2) $10.00 per 1,000 gallons for usage between 15,001 to 30,000 gallons
Tier 3) $20.00 per 1,000 gallons for usage exceeding 30,000 gallons |
Bulk Water Hazard Unit Inspection Fee | Fee charged for an inspection prior to connecting to city water. Expires after one year. $15.00 per vehicle or device. |
Water Theft Fee | Fee for stealing water. Illegal connection bypassing water meter, Illegal connection to hydrant, etc. $250.00 per offense |
Cross Connection Control Inspection Scale of Fines | 1st Warning: (Verbal or Written Warning) 15 days to correct deficiency: $0.00 fine per offense* 2nd Warning (Written), 15 days to correct deficiency: $150.00 fine per offense* 3rd Warning (Written), Water is shut off until the issue is corrected and re-inspected : $250.00 fine per offense* *per backflow device/assembly Note: Each offense is separate. North Logan City can implement any of these items based upon severity of the infraction. |
Construction Water Hydrant Permit - | Construction Water Hydrant Rental Deposit:*
$3,000 (deposit returned in full, minus $150 in administrative fees) |
Pool Filling Permit -
When allowed per North Logan City Water Conservation Plan | Pool Fill Application: $100 + Water Usage (Residential 1” Use Tiered Rates) |
Bulk Water Permit -
When allowed per North Logan City Water Conservation Plan | One Bulk Water Fill Up*: $75 |
Illegal Discharge/Connection Fee: | $50.00 Fee for first finding $150.00 Fee at second finding $500.00 Fee at third finding and water shutoff |
The Sewer Fee Per Month Shall be the sum of: |
|
Sewer Connection Outside North Logan City Corporate Limits: | Administrative Fee: $25 The sewer impact fees and the monthly sewer user fees for connections outside North Logan's corporate limits shall be 1.5 times the associated fees within the fee schedule. |
* The rate for each fiscal year is set each Spring by computing the water used during those months that the meter was not read during the preceding winter season. That user’s rate is then used for the next fiscal year beginning in July (The billing sent out in end of July/early August for July usage). New users without a history of usage will be estimated using the same rate used to compute their initial water bills.
Construction Activity Permit Application (This application must include a Stormwater Pollution Prevention Plan (SWPPP) and a Notice of Intent (NOI-Permit) from the Utah Division of Water Quality.) | $500.00 |
Stormwater Violation Fee - Violation of Stormwater Master Plan or State Stormwater Regulations. | $100.00 per occurrence, or per day of violation |
Construction Activity Permit Application - less than One Acre of disturbed ground (This application must include a sketch plan detailing the Stormwater Best Management Practices (BMP) that will be used on site.) | $175.00 |
Single Family Residence | $4.75 per month |
Multiple Family Residences up to and including Four-Plexes | $3.25 per month per unit |
Residential Units larger than Four-Plexes | $3.50 per month per ERU (An ERU is defined as 4,700 square feet of impervious surfaces on the property including roof, driveway, parking, etc. The ERU for a property is rounded up to the nearest whole number.) |
Non-Residential Developed Property | $3.50 per month per ERU |
Non-Developed Property | No Stormwater Utility Fee |
Dog Licenses Valid from the time of issue until the date when the animal’s most recent, valid rabies vaccination certificate expires, usually three years (new born animals usually one year). The expiration date on the animal’s vaccination certificate shall be the expiration date of the city license. | License Fee Dog (not spayed/neutered) $25.00 Dog (spayed/neutered) $15.00 Animals licensed for a portion of the time for which the rabies vaccination is valid (new move ins, newly acquired animals, etc.) are still charged the full amount for the initial license. |
Kennel License Per Year | $50.00 (Plus the one-time cost of the conditional use permit) |
Impound Fee | $15.00 first offense $30.00 second offense $100.00 third offense (for multiple offenses, the higher impound fee is charged if the offense is within a time frame of 365 days) |
Boarding Fee | $14.00 per day* for dogs, or $10.00 per day* for cats, or actual cost to the city, whichever is greater * minimum of one day's fee charged regardless of actual time boarded |
Euthanasia Fee | $25.00 or actual cost to the city, whichever is higher |
Tag replacement fee | $3.00 |
Note. Wherever the Master Fee Schedule states “or actual cost to the city” the applicant must reimburse the city for all costs incurred by the city arising with respect to the fee including any reasonable and necessary legal, engineering, or other professional fees; costs of advertising or giving of legal notice; special material; or other direct costs.
Building Permit Fee*** | As established in the 1997 Uniform Building Code adjusted annually by the CPI. |
A down payment towards the cost of the building permit fee is payable when the applicant first applies for the building permit. If the applicant withdraws the application after the plans have been reviewed; or if the applicant does not complete the application process by picking up the application and paying for the permit; or if the plans change significantly such that they must be reviewed again; that downpayment is forfeited to the city to cover the cost of reviewing the plans. The City Administrator may authorize a refund of a portion or all of the down payment if there are extenuating circumstances.
| |
Combined Electrical, Mechanical, Plumbing Permit Fee | 27.5% of the Building Permit Fee |
Water Meter Fee | Cost of Meter and Supplies Direct market cost of the meters and supplies needed plus $60.00 installation fee. Cost of meters will be verified by Public Works Department. Commercial meters may qualify for a discounted fee based upon the incentive program. (Must be approved by the City Administrator) |
Road Impact Fee | Residential (per housing unit) For building types other than those listed above, fee will be calculated by utilizing the Institute of Transportation Engineers (ITE) Manual and the North Logan Impact Fee Analysis report dated June 25, 2024. |
Water Impact Fee | Size of Meter (inches) Fee per meter For meters other than those listed above, fee will be calculated by the "Capacity Ratio to Standard Meter (3/4")". |
Residential Sewer Impact Fee | North Service Area Fee South Service Area Fee |
Non-Residential Sewer Impact Fee | North Service Area (Pipe Size in Inches) Fee South Service Area (Pipe Size in Inches) Fee For pipes other than those listed above, fee will be calculated by the "Capacity Ratio to 4" Sewer Pipe". |
Parks & Trails Impact Fee | Residential Household/Housing Unit $5,315 |
Logan City Imposed |
* LCIWTIF Definition: Multi-family refers to a residential dwelling that consists of duplex, triplex, quadplex, apartment, condominium, and all other dwelling units that are individually or jointly water metered and not classified as Single Family Residential. These may consist of one building or multiple buildings within a complex. Units can be arranged side-by-side or stacked vertically and can be owned individually or leased separately. |
* The standard water meter is a one inch meter. Smaller meters may be provided for more accuracy if allowed by the Standard Plumbing code. In cases where facilities need additional flow which can only be provided by meters larger than 1.5 inches, compound meters will be installed to improve accuracy and to protect the city water system in case of line failure.
** In cases where larger meters are approved, fees for meters larger than 2 inches will be established using the relative capacity ratio of the meter as compared to the capacity of the standard one-inch meter (similar to the method used to determine the fees for the 1.5 and 2 inch meters); or the fees may be determined in accordance with Section 6-404, Adjustment of Impact Fees, Paragraph A. 3.
*** In the event of damage caused by fire or natural disaster to an occupied home where building permit fees and/or inspection fees are required for refurbishment or reconstruction, and such fees are not completely covered by insurance and where this creates a hardship for the owner, the owner may apply for waiver of that portion of building permit fees and/or inspection fees not covered by insurance. After review of the waiver application by city staff and upon approval by the building department, those fees not covered by insurance may be waived.
Water Rights Fee**** | Per Acre Foot |
Single Family Lot (No Secondary Irrigation) | $1,000 per acre foot (Take total acreage of lot. Subtract total non irrigated acreage of the lot. Then multiply that value by four (ie four acre ft. per acre). Then add 0.45 acre ft per lot. Multiply that value by 1,000. |
Single Family Lot (Secondary Irrigation) | $1,000 per acre foot 0.45 acre ft per lot. Multiply that value by 1,000. (Or equivalent acre ft allocated to North Logan City in water share/rights) |
Multi Unit Development (3+ Units) (No Secondary Irrigation) | $1,000 per acre foot (Take total acreage of development. Subtract total non irrigated acreage of the development. Then multiply that value by four (ie four acre ft. per acre). Then add 0.45 acre ft per unit. Multiply that value by 1,000. |
Multi Unit Development (3+ Units) (Secondary Irrigation) | $1,000 per acre foot 0.45 acre ft per unit. Multiply that value by 1,000. (Or equivalent acre ft allocated to North Logan City in water share/rights) |
Non-Residential Development (No Secondary Irrigation) | $1,000 per acre foot (Take total acreage of parcel/lot. Subtract total non irrigated acreage of the lot. Then multiply that value by four (ie four acre ft. per acre). Then add total calculated indoor water usage acre ft. Multiply that value by 1,000. |
Non-Residential Development (Secondary Irrigation) | $1,000 per acre foot Total calculated indoor water usage acre ft. Multiply that value by 1,000. (Or equivalent acre ft allocated to North Logan City in water share/rights) |
**** Fees In Lieu Of Water Rights Dedication: The required fee to be paid in lieu of dedication of water rights or shares.
Application Fee for Annexation, Boundary Change, or Disconnection from Municipality | $750.00 |
Note. Wherever the Master Fee Schedule states “plus any costs incurred by the city that exceed this amount” the applicant must reimburse the city for all costs incurred by the city arising with respect to the application including any reasonable and necessary legal, engineering, or other professional fees; costs of advertising or giving of legal notice; special material; or other direct costs. The basic fee is intended to cover the normal costs of processing an application but if unusual costs arise from processing the application, the applicant shall be responsible for any additional costs above and beyond the basic fee.
Sidewalk and Street Permit | No fee, but must pay any costs incurred by the city |
Construction of Driveway Permit | No fee, but must pay any costs incurred by the city |
Building Material on Street Permit | No fee, but must pay any costs incurred by the city |
Excavation Permit (misc. excavations not in city right-of-way) | No fee, but must pay any costs incurred by the city |
Street Excavation Permits or Encroachment Permits | Note: Fee is dependent upon type of finished surface for excavated trench as per the following schedule. Cash Fee is refunded or Surety Bond is Released after 24 months if excavation’s surface is accepted by city official. |
Note. Wherever the Master Fee Schedule states "pay any costs incurred by the city" the applicant must reimburse the city for all costs incurred by the city arising with respect to the application including any reasonable and necessary legal, engineering, or other professional fees; costs of advertising or giving of legal notice; special material; or other direct costs.
Sign Permit | $75.00 plus any costs incurred by the city that exceed this amount |
Sign Construction Inspection Fee | Construction Inspection Fee shall follow the Building Permit Fee, as stated above. |
Note. Wherever the Master Fee Schedule states “plus any costs incurred by the city that exceed this amount” the applicant must reimburse the city for all costs incurred by the city arising with respect to the application including any reasonable and necessary legal, engineering, or other professional fees; costs of advertising or giving of legal notice; special material; or other direct costs. The basic fee is intended to cover the normal costs of processing an application but if unusual costs arise from processing the application, the applicant shall be responsible for any additional costs above and beyond the basic fee.
Administration fee | $20.00 per billable job |
GRAMA Request Fee: Staff Time for compiling, formatting, manipulating, packaging, summarizing or tailoring the record to meet request; and search, retrieval and other direct time for complying with request. | After the first quarter hour (15 minutes) of staff time, North Logan City may charge an hourly charge, not exceeding $15.00 an hour in increments of 15 minutes.* |
Labor Reimbursement | Scheduled Work During Regular Business Hours: Regular Public Works Employee - $60.00 per hour Temporary Employee - $35.00 per hour Emergency Response Work (Weekend/Holiday) Time and a half or double time for work done in overtime or holiday status. Use for the base rate the actual reimbursement rate for employee that is called out. |
Reimbursement for Heavy Equipment (does not include labor or materials) | Backhoe - $150.00 per hour Dump Truck - $100.00 per hour Loader - $150.00 per hour Other - $75.00 per hour (Skid steer, Tractor & Mower, Asphalt Roller, Compressor, etc.) |
Reimbursement for Sewer Maintenance (Includes labor of operator) | Sewer Jet - $1.50 per foot Camera Inspection - $1.50 per foot |
Reimbursement for Materials or Supplies Used | Actual cost plus 10% overhead |
Public Works: Water Meter Connection | $25.00 per visit |
Public Safety Services for Organized Events 1) Police, per officer | $48.00 per hour (3 hour minimum) $70.00 per hour (3 hour minimum) $50.00 per hour (3 hour minimum) |
* North Logan City requires payment of estimated fees before beginning to process a records request if the fees are expected to exceed $50.00; pursuant to Utah Code Annotated Section 63G-2-203(8).
Misc. Development Fees | |
General Plan Amendment Application and Review Fee | $600.00 |
Zoning Map Amendment (Re-Zone) Application and Review Fee | $600.00 |
Zoning Text Amendment Application and Review Fee | $600.00 |
Development Agreement Application and Review Fee | $600.00 |
Development Agreement Amendment Application and Review Fee | $300.00 |
Preliminary Plat, Development Plan, or Subdivision Improvement Plans Amendment Application and Review Fee | $1,000.00 + $50/Lot + Costs Incurred |
Conditional Use Permit Application or Amendment Review Fee | $300.00 |
Design Review Application and Review Fee | $450.00 |
Land Use Appeal Authority Consideration Application Fee | $400.00 + $50/Hr. after 5 Hrs. |
Subdivision Plat Amendment Application and Review Fee | $350.00 |
Vacation of Public Right-Of-Way or Public Utility Easements Application and Review Fee | $375.00 |
Subdivision Plat Amendment Including Vacation of Pubic Right-Of-Way and/or Vacation of Public Utility Easements Application and Review Fee | $725.00 |
Parcel Boundary Adjustment / Lot Line Adjustment Application and Review Fee | $225.00 |
Land Use Permit Application and Review Fee | $50.00 |
Residential Single-Family, Two-Family, or Townhome Subdivision Projects | |
Concept Plan (If Requested by Applicant) Application and Review Fee | $500.00 + $25/Lot |
Preliminary Subdivision Plat and Subdivision Improvement Plans Application and Review Fee | $2,000.00 + $100/Lot + Costs Incurred |
Final Subdivision Plat Application and Review Fee | $1,000.00 + $100/Lot + Costs Incurred |
Preliminary Subdivision Plat and Subdivision Improvement Plans (SENSITIVE LANDS) Application and Review Fee | $2,000.00 + $100/Lot + Costs Incurred + Costs for 3rd Party Geologic Review |
Final Subdivision Plat (SENSITIVE LANDS) Application and Review Fee | $1,000.00 + $100/Lot + Costs Incurred + Costs for 3rd Party Geologic Review |
All Other Subdivision Projects | |
Concept Plan Application and Review Fee | $350.00 + $10/Lot + Costs Incurred |
Preliminary Subdivision Plat and Development Plan Application and Review Fee | $550.00 + $10/Lot + Costs Incurred |
Final Subdivision Plat and Subdivision Improvement Plans Application and Review Fee | $650.00 + $10/Lot + Costs Incurred |
Preliminary Subdivision Plat and Development Plan (SENSITIVE LANDS) Application and Review Fee | $550.00 + $10/Lot + Costs Incurred + Costs for 3rd Party Geologic Review |
Final Subdivision Plat and Subdivision Improvement Plans (SENSITIVE LANDS) Application and Review Fee | $650.00 + $10/Lot + Costs Incurred + Costs for 3rd Party Geologic Review |
Construction Inspection and Project Closeout Fees | |
Construction Inspection Fee (Single-Family, Townhome, and Two-Family Residential) | 2.75 % of Total Infrastructure Improvement Cost |
Construction Inspection Fee (Multi-Family Residential, Mixed-Use Institutional, Commercial, and Industrial) | 2.75 % of Total Infrastructure Improvement Cost |
Seal Coat Fees | Surface Treatment Fee: $0.75 per Sq. Ft. |
Note. Wherever the Master Fee Schedule states “plus any costs incurred by the city that exceed this amount” the applicant must reimburse the city for all costs incurred by the city arising with respect to the application including any reasonable and necessary legal, engineering, or other professional fees; costs of advertising or giving of legal notice; special material; or other direct costs. The basic fee is intended to cover the normal costs of processing an application but if unusual costs arise from processing the application, the applicant shall be responsible for any additional costs above and beyond the basic fee.
Special Event Permit Fee, for events which include any of the following:
| $75.00 (Resident) $100.00 (Non-Resident) |
Special Event Permit Fee, for events which may include any of the above and includes any public display of fireworks. | $250.00 (Resident) $500.00 (Non-Resident)
|
Fireworks Emergency Services Standby Fee | To be determined, based on the size of the show and the number of Firefighters and Trucks/Apparatus needed onsite |
Mass Gathering Permit
| $100.00 (Resident) $135.00 (Non-Resident) |
Facility Use Fee
| Each Facility: $0.00 (City Employee)
(Facility Use Fees are refundable, except for $10, if the city is notified two weeks prior to the reserved time.) |
Key/Cleaning/Damage Deposit Park Facilities: | $100.00 (Resident) $100.00 (Non-Resident) $0.00 (City Employee) (The Deposit is refundable if the facility/field is left clean and without damages and key is returned. Intended to cover the cost of re-keying a facility if a key is lost and/or extra cleaning or repairs if needed.) |
Pickleball Courts | $10.00/hour (Resident) $25/hour (Non-Resident) |
League Scheduling Fee Applies to a reservation of multiple games on different dates by one organization (this fee does not apply to a single tournament that consists of less than four (4) days of consecutive reservations). | $75.00 per organization* * Any league schedule received less than three (3) weeks prior to the first game of the league will be charged a $50.00 late fee, in addition to the $75.00 League Scheduling Fee. |
Athletic Fields
| No difference between resident and non-resident fees.
* Competing Programs with North Logan City Parks and Recreation See Athletic Field Reservation Policy for definition. |
Athletic Field Deposit To ensure that used areas are cleaned up, left undamaged, and rules are followed. Partial or Full deposit may be kept at discretion of Parks and Recreation Director | No difference between resident and non-resident fees. $100.00 - Single Reservation |
Field Prep. (upon request)
| No difference between resident and non-resident fees.
If grounds crew (2 person minimum) is required to prepare fields, re-chalk at intervals, and maintain facility; North Logan Parks and Recreation will provide grounds crew staff at $20.00/person/hour. |
Volleyball Pit Use Fee | (no difference between resident or non-resident) $0.00 (City Employee) |
Tennis Court Use Fee | (no difference between resident or non-resident) $0.00 (City Employee) Use fee is discounted 50% if done in conjunction with reserving the Elk Ridge Main Area (Lion's Bldg. / pavilion / basketball court.) |
Fee for Making Credit/Debit Card Payment by Phone | $5.00 |
Returned Check | $20.00 per check |
Copy of Accident Report | $10.00 per copy |
Overdue Account Administration Fee (This fee is chargeable when non-receipt of payment for utilities or any other fee owed to the city requires the use of a collection agency or small claims court action to pursue payment.) | $80.00 per processing action (meaning for each referral to a collection agency or each small claims complaint) plus any costs incurred by the city that exceed this amount. |
Copying to CD, DVD or Flashdrive | $15.00 |
Photocopies | $0.10 per Black & White copy (letter or legal size) |
FAX | $1.00 per page |
Burning Permits | Generally no fee unless inspection is required then $5.00 plus any costs incurred by the city. |
Certification of Document | $5.00 per page certified, unless otherwise established by state law |
License and Inspection Fee for an Accessory Dwelling Unit in a Single Family Residence (pursuant to NLC Code 12C-515) | $30.00 plus any costs incurred by the city that exceed this amount |
Senior’s Luncheon (Restricted to North Logan residents 55 and older plus elected city officials) | Cost for Participant - $4.00 Amount paid by the City - the remainder to complete the total cost for lunch. (Currently the lunches cost $7.29) |
Non-Resident Library User Fees | Family Library Card - $90 per year paid annually, or $24 per 3 month consecutive period. (allows for cards for all members of the family living in the residence. Level of library use is the same as North Logan City residents or those paying North Logan property taxes) |
Purchase of Burial Rights (per plot) | Residents - $350 Non-Residents - $600 |
Opening/Closing of Grave for Veterans – (Mon-Sat) | Residents - $250 Non-Residents - $325 |
Opening/Closing of Grave for Infants – Weekdays (M-F) (children under 2 years) | Residents - $200 Non-Residents - $300 |
Opening/Closing of Grave for Infants – Saturdays (children under 2 years) | Residents - $250 Non-Residents - $350 |
Opening/Closing of Grave – Weekdays (M-F) (persons 2 years of age and older) | Residents - $325 Non-Residents - $500 |
Opening/Closing of Grave – Saturdays (persons 2 years of age and older) | Residents - $676 Non-Residents - $876 |
Burial of Cremated Remains – Weekdays (M-F) | Residents - $150 Non-Residents - $275 |
Exhumations/Disinterments – Weekdays (M-F) | Residents – Fee + $175 Non-Residents – Fee + $300 |
Burial of Cremated Remains – Saturdays | Residents - $250 Non-Residents - $350 |
Exhumations/ Disinterments – Saturdays | Residents – Fee + $275 Non-Residents – Fee + $400 |
Headstone Installation Fee | $20 |
Administrative Fine for Placing a Monument without City Approval | $500 |
Administrative alteration or re-print of Deed (Certificate of Burial Rights) | Residents – $50 per Deed Non-Residents – $75 per Deed |